SS97 Jean Paul Gaultier Trompe L’oeil Denim Jacket
Worldwide Shipping not available
Processed in 24 hours
Pickup at DolceVitaHub Store not available
Ready in 24 hours
12 Passage de la Bonne Graine, 75011 Paris
Description & Measures
One of Gaultiers signature motifs is the trompe-loeil print, which is a pattern that mimics a real texture or object. Gaultier has used this technique creatively to give an illusionary dimension to his clothes, such as jumpers that appear to have oversized shoulders, jackets that appear to have sleeves attached at the back, or dresses that appear to be made of torn fabric. The trompe loeil print has become an iconic feature of the JPG brand and has been used in many collections over the years. This denim jacket from 1997 is a perfect representation of the JPG spirit and has beautiful details. It can be fastened at the front with a zip or with engraved metal buttons.
Shipping
All orders will be processed in 24/48 hours from France (Paris) via the French local transporter.
With our transporter:
- If you live in France, it takes 2 working days.
- If you live in Europe, it takes 4 to 5 working days.
- If you live outside Europe, it takes 5 to 8 working days.
Please note that these delivery times are estimates and may be affected by factors beyond our control, such as customs delays or shipping carrier issues.
For information on returns, see our Refund Policy page.
Expert authentication
Every item we sell is carefully inspected and authenticated by our team. We check each piece for quality, originality, and accuracy, backed by years of experience in second-hand luxury. All flaws and measurements are clearly listed to ensure total transparency.
General care instructions to extend the life of your garments:
- Read care labels before washing
- Wash with similar colours
- Use cold or warm water depending on the fabric
- Avoid tumble drying, prefer air drying
- Iron at low temperature or use a protective cloth
- Store clothes properly
- Be careful of overexposure to the sun
AUTHENTICATED
inspected & controlled
FAST PROCESS
within 24/48 hours