AW2013 Balenciaga Grey & Navy Sweater
Worldwide Shipping available
Processed in 24 hours
Pickup at DolceVitaHub Store available
Ready in 24 hours
12 Passage de la Bonne Graine, 75011 Paris
Description & Measures
This Balenciaga sweater from the AW2013 collection features a refined white and navy knit pattern on the body, complemented by solid navy sleeves. It has a round neckline and ribbed cuffs and hem that add to its classic silhouette. The textured fabric highlights Balenciaga’s attention to detail and understated luxury in knitwear design. Suitable for layering, this piece blends subtle color contrast with a timeless shape. In great overall condition. Marked size 38 IT. Fits men XS. Fits women S. Model is 181 cm.
Hand-measured with the garment laid flat.
| chest | 49.00cm | 19.1inch |
| length | 54.00cm | 21.1inch |
| shoulders | 47.00cm | 18.3inch |
| sleeve | 54.00cm | 21.1inch |
Shipping
All orders will be processed in 24/48 hours from France (Paris) via the French local transporter.
With our transporter:
- If you live in France, it takes 2 working days.
- If you live in Europe, it takes 4 to 5 working days.
- If you live outside Europe, it takes 5 to 8 working days.
Please note that these delivery times are estimates and may be affected by factors beyond our control, such as customs delays or shipping carrier issues.
For information on returns, see our Refund Policy page.
Expert authentication
Every item we sell is carefully inspected and authenticated by our team. We check each piece for quality, originality, and accuracy, backed by years of experience in second-hand luxury. All flaws and measurements are clearly listed to ensure total transparency.
General care instructions to extend the life of your garments:
- Read care labels before washing
- Wash with similar colours
- Use cold or warm water depending on the fabric
- Avoid tumble drying, prefer air drying
- Iron at low temperature or use a protective cloth
- Store clothes properly
- Be careful of overexposure to the sun
AUTHENTICATED
inspected & controlled
FAST PROCESS
within 24/48 hours