AW2011 Dolce & Gabbana Rabbit Fur Hooded Hybrid Denim Vest Jacket
Worldwide Shipping available
Processed in 24 hours
Pickup at DolceVitaHub Store available
Ready in 24 hours
12 Passage de la Bonne Graine, 75011 Paris
Description & Measures
This 2000s Dolce & Gabbana hybrid vest jacket artfully fuses rugged denim with plush rabbit fur, encapsulating the label’s distinctive blend of opulence and streetwear edge. The structured denim body contrasts with a voluminous hood and trim crafted from soft rabbit fur, offering texture and visual intrigue. Vintage fashion enthusiasts will appreciate the harmonious balance of tactile materials and innovative design. In good condition. Made in Italy. Marked size 44 IT, fitting men’s S-M and women’s L. Model is 176cm.
Hand-measured with the garment laid flat.
| chest | 47.00cm | 18.3inch |
| length | 64.00cm | 25.0inch |
| shoulders | 42.00cm | 16.4inch |
Shipping
All orders will be processed in 24/48 hours from France (Paris) via the French local transporter.
With our transporter:
- If you live in France, it takes 2 working days.
- If you live in Europe, it takes 4 to 5 working days.
- If you live outside Europe, it takes 5 to 8 working days.
Please note that these delivery times are estimates and may be affected by factors beyond our control, such as customs delays or shipping carrier issues.
For information on returns, see our Refund Policy page.
Expert authentication
Every item we sell is carefully inspected and authenticated by our team. We check each piece for quality, originality, and accuracy, backed by years of experience in second-hand luxury. All flaws and measurements are clearly listed to ensure total transparency.
General care instructions to extend the life of your garments:
- Read care labels before washing
- Wash with similar colours
- Use cold or warm water depending on the fabric
- Avoid tumble drying, prefer air drying
- Iron at low temperature or use a protective cloth
- Store clothes properly
- Be careful of overexposure to the sun
AUTHENTICATED
inspected & controlled
FAST PROCESS
within 24/48 hours